Our Process
Our aim with the Inova process is to deliver exceptional service to our
customers. We ensure that you are kept informed at every stage of the
process and provide you with a delivery schedule as soon as your order
is confirmed. We take great pride in our responsiveness and
transparency, which is why we assign a dedicated account manager to
each of our customers. This way, you can receive regular updates, ask
any questions, and get the support you need.
Step 1
Site Visit
Step 2
DesignStep 3
PlanningStep 4
Building ControlStep 5
FabricationStep 6
InstallationStep 1
Site Visit
-
Site Visit 1-2 weeks
After you have contacted our team and secured a reservation package, we will connect you with contractors from our network (based on your location).
These professionals will assess your property and provide you with insights on the installation costs.
Step 2
Design
Design 1 week
We will assign one of our in-house designers to work with you. Providing
you with detailed information about the site plan, elevations, and specific design configurations.
Step 3
Planning
Planning 8-12 weeks
The local planning application for the design choices you have made will be submitted. This time line is outside of our control. Typically planning takes between 8-12 weeks.
We advise that this process starts as soon as possible to avoid delays. Our team will be available to advise you throughout the process should any questions or comments come up that need to be addressed.
Step 4
Building Control
Building Control 1 week
Our designers collaborate with structural engineers to create a plan for building control submissions and obtain building control approval.
Step 5
Fabrication
Fabrication 1 Week
After obtaining your planning permission, we will initiate the production process as per the design and engineering configurations compliant with the building regulation requirements. As the Inova system boasts a distinctive design, most of the building components are readily available in stock, except for the customised foundations that are produced to fit the site conditions. This entire process will be completed within a week.
Step 6
Installation
Installation 1-2 Week
You will work directly with your chosen installer to get your building assembled and complete.